skip to main | skip to sidebar

Keri & Jewels Casa Redo

Thursday, April 12, 2007

Preparing the Hallbath for the Tub


Jewels replaced the rotten studs around the bathroom window and insulated the lower wall. The window is actually going away - we are replacing the top part of the window with 2 rows of glass block.






Posted by Jewels & Keri at 4:49 PM

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

My Blog List

Blog Archive

  • ►  2019 (3)
    • ►  June (3)
  • ►  2009 (8)
    • ►  August (4)
    • ►  July (2)
    • ►  February (1)
    • ►  January (1)
  • ►  2008 (64)
    • ►  November (6)
    • ►  October (4)
    • ►  August (6)
    • ►  July (2)
    • ►  June (2)
    • ►  May (5)
    • ►  April (6)
    • ►  March (11)
    • ►  February (3)
    • ►  January (19)
  • ▼  2007 (144)
    • ►  December (2)
    • ►  November (10)
    • ►  October (9)
    • ►  September (12)
    • ►  August (12)
    • ►  July (13)
    • ►  June (16)
    • ►  May (12)
    • ▼  April (11)
      • Things that can't be seen
      • Front Columns
      • Last of the Sliders
      • New Bedroom Door
      • Kitchen Windows Installed
      • Easter 2007
      • Where is the Kitchen Wall?
      • Utility and Kitchen Windows
      • ReWired!
      • Name this Bird
      • Preparing the Hallbath for the Tub
    • ►  March (16)
    • ►  February (14)
    • ►  January (17)

About Me

Jewels & Keri
View my complete profile