Tuesday, January 30, 2007
The Foundation is Finished!!!
Sunday, January 28, 2007
What's Wrong With This?
First Church Gathering
Fascia
Thursday, January 25, 2007
Bathtubs Begone!
Tuesday, January 23, 2007
Middle Child Not Forgotten (more house info coming soon)
Monday, January 22, 2007
Locks of Love (again, nothing to do with the house)
She held onto the ponytail during her entire hair cut!
The finished look...very cute!
It's Electrifying!
The visual improvement is incredible. Before the backyard was cut in two by the wires running from the back utility lines to the weather head. It now looks so open. (Please ignore the ugly pool fence. I promise it will change!)
Center Point FINALLY got the order right and restored power today. Night work can continue!
Work in Progress
Saturday, January 20, 2007
Window Installation 101...
January 14 - 19th
Talked to the city inspectors. They agree with the premise of (2) 2x12 beams with joist hangers for the flush beams. All my spans are less than 12' wide. Request that I also glue and use plywood filler between beams. Weather is still affecting electrician- now he is suppose to be on site tomorrow, Saturday.
Dad, Bill and I took the night off. Went to the hockey game with Keri and the two older kids. Save my strength for the up coming weekend push.
January 18th
Logo Electrical is running behind due to the weather. Suppose to start Wednesday, then Thursday now tomorrow. Work will have me traveling soon so I took the morning off to get the building permit. After a pretty smooth 2-1/2 hours permit acquired! Good news. Meet Mike the plumber at house to discuss plumbing options. The Pex seems viable but some possible $ issues with how the two bathrooms were vented back in 1950's.
After work Bill starts demo of front bedroom and finishes middle bedroom. The wonky return air bump is no more. I install the locks on the garage cabinets. Decide to push my way into stuck attic access in garage to see if any junk in attic is worth anything before electricians get up there. Nope, just trash.
Bad news. While looking at the trash in attic I notice the framing is different over the garage / kitchen / dining room than it looks like from the hallway attic access across the house. Now planned walls that were previously non-load bearing appear to be load bearing. Irritating but not insurmountable. Just more time and materials. Biggest hassle is now permit, not yet 1 day old, will have to be modified ( again with just more time, a morning, and materials, additional fees.)
January 17th
Order the new replacement dumpster on the way to work. At lunch buy cabinet door locks for new garage cabinets. Too many future subs walking around garage when I'm not there. After work a three some of Dad, Bill and I start the fill in the dumpster. It was a "Snow Day" so kids are out of school and it is cold and rainy and not the kind of weather to play pack the dumpster but it had to be done. 30 yard dumpster is beyond full and ready to be dumped. West Kitchen cabinets and all the Kitchen walls are demo'd.
Going to try for the building permit tomorrow. Stay up till 2:00+ finishing drawings, printing out three sets (2 for city + 1 for me).
January 15th
Company gives me Martin Luther King day off! I'll skip the two competing parades this year (I saw the last eight years in a row) and work on the house. Dad and I start early tearing into gyp. I continue on the master bath walls and get them all down. After master walls the hall bath tile walls are next to go. Dad and I rented a chipping / demolition hammer to jack up the tile floors and mud beds. As usual Home Depots tool rentals are awful! Super dull bits and a broken on / off switch. Dad and I take turns plugging in hammer while the other holds on and then signaling when to unplug when you need to stop. The only good thing about Home Depot tool rentals is the 10:00 p.m. rental returns.
The hammer is heavy but works, eventually, on the floors. POS hammer breaks, bad brushes in motor, with less than 10 minutes left to hammer. Load hammer, return hammer, have slim knowledge skeptical teen rental agent give you the once over until she to admits the motors just not working. Get new hammer, load it, drive, unload, 10 minutes worth of chipping, load, drive, unload, return. A lot of work but now it's done. So are Dad and I. Good night.
January 14th
Spent a couple hours of daylight after church acquiring materials and tools.
Dumpster is getting a little past half full. Majority of gyp is down in the front public parts of the house. Moving into the back bedrooms / closets and bathrooms. Took down master vanity and a wall and a half of tile. Realized that I need to wear my steel toe boots during tile demo when large heavy chunk misses little piggy toes in tennis shoes by a narrow margin.
Thursday, January 18, 2007
More Destruction!
Here are a few more pictures:
Jewels preparing to take off the master bath tile
Wednesday, January 17, 2007
January 9 - 13, 2007
Jewels removing wall in existing utility room (soon to be the kitchen !)
Keri checking out the holes and mess the foundation company made
Final Tee Ball gave of the year at 10:00 a.m. followed by team pizza party and trophy award ceremony.
Dad finished removing masonite and nails from Den. Glad that job is over.
I removed aluminum siding fascia and soffit from house.
I removed the wood fascia from house.
Keri bent nails down on removed wood fasica and help stack siding for soon trip to recycler.
Bill trimmed front ivy, crepe mertyls, every tree and bush that is to stay on front and sides of the house.
Bill, Keri and I removed gyp from Living Room.
Removed low fur down and half wall from Living Room.
Removed gyp on north wall of Den
Called to get estimate from Starfish roofing. Roof quote good but discussions led to consideration of replacing existing fascia prior to new roof install.
After kids put down to sleep removed remaining west and north wall paneling and gyp from Office.
Removed lay-in ceiling from Office ceiling.
Removed plywood pantry.
Removed gyp from east and south walls of original utility room.
During the day Andy was on site with the foundation crew removing the masonite from floor and pulling all nails. Too many and too diverse nails used to attach masonite. Was a hard bad job.
After Tee Ball practice at 5:30 and dinner the Bill, Keri and I mobilized at the house.
Bill removed gyp in dining room and Living room.
Keri and I measured and taped out the kitchen cabinets, new windows and new doors.
January 9th
Killing time before closing at 2:00 Keri and I went to Home Depot and bought matching keyed locksets w/ deadbolts.Closed on the house at 2:00. Chang nor his realator showed up.Left the title company at 3:30.Went by the storage shed and got tools and beginings of the house occupation.Changed out the front and back door locks.Changed out the old (ours) back door lock with the lockset of the old office to secure tools from subs.Dad, Bill, Keri and I removed all carpet in the house.Bill trimmed bushes and trees in the front yard.Did exploratory demo of vinyl flooring in kitchen and found plywood - good for us.Did exploratory demo of vinyl flooring in Den and found vinyl was adhereed to masonite nailed to the hardwoods below - good for us.Did exploratory demo of vinyl flooring in Entry and found hardwoods - good for us.When carpet removed found the outline and plywood fillers in the floor of older 3 bedroom configuration.